Red Cliff

Red Cliff History: Projects 2011

 

Sand Hills Water Improvement Project

58,400 LF, 12-Inch PVC
25,689 LF, 8-Inch PVC
2,600 LF, 6-Inch
193 EA, Services
53 EA, Fire hydrants
5,500 Cys Earthwork
Engineer: CSA Design Group, Inc.
Owner: Lower Valley Water District
Contact: Saul Trejo, P.E. 915-791-4496
Contract Value: $1.2M
Completion: 2011

 

 

Eastside Service Area 24-Inch Waterline

12,240 LF, 24-Inch DIP Water
10 ea, 24-Inch Butterfly Valves
200 LF, 12-Inch Water
9 ea, 12-Inch Gate Valves
Owner: El Paso Water Utilities Public Service Board 
Engineer: Malcolm Pirnie   
Contact: Gilbert Trejo, P.E. 915-757-3904
Contract Value: $1.2M
Completion: 2011

 

South Canadian River 18-Inch Relief Main

8,245 LF, 18-Inch Gravity Sewer
672 LF, 24-Inch Gravity Sewer
107 LF, 8-Inch Gravity Sewer
33 ea, 48-Inch Manholes
5 ea, 96-Inch Manholes
15,152 SY, Solid Slab Sod
560 TN, Type 2, 18-Inch Rip Rap
222 LF, 24-inch Open Cut Casing
687 LF, 24-Inch Steel Casing by Jack and Bore
Owner: Oklahoma City Water Utilities Trust   
Engineer: Garver Engineering   
Contact: Shane Smith, P.E., 405-420-4664
Contract Value: $1.3M
Completion: 2011

 

South Desert 16-Inch Water Distribution Main Replacement

4,435 LF, 16-Inch Cathodically Protected DIP
90 LF, 30-Inch Steel Casing by Jack and Bore
155 LF, 30-Inch Steel Casing by Open Cut
245 LF, 16-Inch Restrained Carrier Pipe
4 ea, 2-Inch Combination Air Valves
3 ea, 6-Inch Combination Air Valves
500 CY, Cement Stabilized Backfill
130 SY, Remove and Replace CSBC & HMAC
Remove and Replace Concrete Sidewalk
30 SF, Remove and Replace Concrete Stormwater Spillway    
Owner: El Paso Water Utilities Public Service Board 
Engineer: CDM  
Contact: Stephen Ainsa, P.E., 915-544-2340
Contract Value: $620K
Completion: 2011

 

Mesa Drain Improvements

8,915 LF, Existing Channel Widening
2,350 CYS, Reinforced Concrete Trapezoidal Channel
3,019 SY, Reinforced Concrete Rip Rap Removal
2,220 CY, Reinforced Concrete Transitions
90,870 CY, Excavation of Unclassified Material
853 CY, Reinforced Concrete Rip Rap
2,350 CY, Compacted Structural Fill
24 ea, Access Gates with Signs
12 ea, Irrigation lateral Concrete Supports
2,750 LF, 5-Foot Sidewalk
3,785 LF, Dewatering     
Owner: El Paso Water Utilities Public Service Board 
Engineer: Moreno Cardenas 
Contact: Mark Madina, P.E., 915-532-2091
Contract Value: $3M
Completion: 2011

 

Stormwater Pump Stations Phase 1, (5) Locations

5 ea Lift-Station Remediation’s
Standby Generator upgrades
Electrical Service Upgrades
New Pump Controls
Rebuild Pumps 8 ea
New Pumps 4 ea
Site Improvements   
Owner: El Paso Water Utilities Public Service Board 
Engineer: Brown and Caldwell 
Contact: Janelle Armstrong, P.E., 915-545-4400
Contract Value: $1M
Completion: 2011

 

Norman Phase 2B Well Distribution

35,232 LF, 16” and 12-Inch Waterline
1,500 LF, 14-Inch Directional Drilled HDPE Waterline
470 LF, Bored Casing
13 ea, Air Release facilities
34 ea, Fire Hydrants
23,175 SY, Solid Slab Sodding
Owner: Norman Utilities Authority
Engineer: Norman Utilities Authority
Contact: Jim Speck, P.E., 405-217-7778
Contract Value: $1.5M
Completion: 2011

 

Fort Bliss Diversion Conduits De-Silting Project

4,000 CY, Remove Silt and Debris from 3 ea 90-Inch Storm Conduits
14,000 LF, Concrete Spalling and Concrete Crack Repair by Epoxy Injection   
Owner: El Paso Water Utilities Public Service Board
Engineer: El Paso Water Utilities Public Service Board 
Contact: Carlos Rubio, P.E., 915-594-5685
Contract Value: $344K
Completion: 2011

 

Paisano Waterline Replacement Phase 1

6,895 LF, 48-Inch Welded Steel Water Transmission
7 ea, 48-Inch Butterfly Valves
4 ea Combination Air Valves
6 ea Blow-offs
6,117 SY, HMAC
700 CY, Hard Rock Excavation
305 LF, Curb and Gutter
55 LF, 60-Inch Liner Plate
Dewatering 
Owner: El Paso Water Utilities Public Service Board 
Engineer: Brown & Caldwell 
Contact: Fernie Silva, P.E., 915.478.2849
Contract Value: $2.8M
Completion: 2011

 

Hacienda/Wild-Horse Water, Sewer and Road Extensions

1,700 LF, 15-Inch Trunk Sewer
660 LF, 8-Inch Collector Sewer
Major Dewatering Operations
6,700 LF, 12-Inch Water
4,000 LF, 8-Inch Water
3,930 SY, HMAC
93 ea, Water Services
22 ea, Fire Hydrants
Owner: Lower Valley Water District 
Engineer: CEA Group
Contact: Ulises Estrada, P.E., 915.544.5232
Contract Value: 1.2M
Completion: 2011

 

Fort Hancock Water Collector Line and Site Improvements

6,872 LF, 6-Inch C900
385 LF, 12-Inch Steel Casing
6 ea, Combination Air Release/Vacuum
HMAC with Header Curbs     
Owner: Ft Hancock Water Control District 
Engineer: Brock & Bustillos 
Contact: Sergio Adame, P.E., 915.542.4900
Contract: $204K
Completion: 2011

 

Town of Clint Lift Station Facilities

1,480 LF, 12” – 15” and 18-Inch Trunk Sewer
4,400 LF, 10-Inch Force Main
360 LF, 20” – 24” and 30-Inch Jack and Bore
3 ea, 30 HP Flygt pumps
2,200 GPM Lift Station
38-VF Wet Well
1 ea, Dry Well
1 ea, Monorail System 
Owner: Lower Valley Water District
Engineer: CEA Group 
Contact: Able Garcia E.I.T., 915-544-5232
Contract Value: $1.5M
Completion: 2011

 

Norman Raw Waterline Phase 1

13,868 LF, 48-Inch FRP Raw Waterline
1 ea, Surge Vent Structure
2 ea, Poured in Place Valve Vault Structures
4 ea, Combination Air/Vacuum Release Valve Manholes 
5 ea, Blow-off Piping and Manholes
35 LF, 66-Inch Jack & Bore
150 LF, 66-Inch Open Cut Casing 
Owner: Norman Utilities Authority
Engineer: Garver Engineering
Contact: Shane Smith, P.E., 405-420-4664
Contract Value: $3.2M
Completion: 2011

 

NE Dyer / Railroad Interceptor Phase 1

9,619 LF, 12” – 15” – 18 and 21-Inch Sewer
100% TXDOT ROW
Concrete Approach Replacements
Major Utility Conflicts 
Owner: El Paso Water Utilities Public Service Board
Engineer: El Paso Water Utilities Public Service Board
Contact: Carlos Dominguez, 915-594-5672
Contract Value: $500K        
Completion Date: 2011

 

Fort Bliss Brigade Staging Area

3,600 LF, 10” and 12-Inch Water Line
Owner: Fort Bliss Water Services
Engineer: Jacobs / Huitt-Zollars 
Contact: Daniel Monteros, 915-568-2317
Contract Value: $160K
Completion Date: 2011

 

Fort Bliss Patriot Battalion Complex

1,910 LF, 6 – 8 and 12-Inch Sewer
2,730 LF, 6 and 8-Inch Water
Owner: Fort Bliss Water Services
Engineer: Jacobs / Huitt-Zollars 
Contact: Daniel Monteros, 915-568-2317
Contract Value: $300K        
Completion: 2011

 

Socorro Mission Subdivision Wastewater Improvements

14,720 LF, 8-Inch, Sewer Collector
300 ea, Sewer Laterals
Major Dewatering
Major Street Replacement
Owner: Lower Valley Water District
Engineer: Moreno Cardenas Inc.
Contact: Brian Klaes, P.E., 915-532-2091 Ext. 24
Contract Value: $1.6M
Completion: 2011

 

Mesa Spur 36” Sewer

14,320 LF, 36-Inch Gravity Sewer
250 LF, 48-inch Jack & Bore
Owner: Horizon Municipal Utility District
Engineer: Gray-Jansing Engineering & Assoc.
Contact: Matt Hardison, P.E., 915-269-0197
Contract Value: $2.4M
Completion: 2011

 

Fort Bliss Child Development Center – Logan Heights

450 LF, 6-Inch Sewer
400 LF, of 4 & 6-Inch Water
Owner: Fort Bliss Water Services
Engineer: Parkhill, Smith & Cooper, Inc.
Contact: Daniel Monteros, 915-568-2317
Contract Value: $61K
Completion: 2011

 

Fort Bliss Water Security Improvements

Design/Build Contract 
Installation of Security Improvements at Vulnerable Facilities
Owner: American States Utility Services
Engineer: Fort Bliss Water Services Company
Contact: Daniel Monteros, 915-568-2317
Contract Value: $880K
Completion: 2011

 

Fort Bliss Building 56A Expansion

380 LF, 4 & 12-Inch Sewer
40 LF, 6-Inch Water
Owner: Fort Bliss Water Services
Engineer: Luckett & Farley
Contact: Daniel Monteros, 915-568-2317
Contract Value: $660K
Completion: 2011

 

Little River Interceptor Phase III & NW Interceptor

14,650 LF, 36-Inch Interceptor Sewer
62 ea, Epoxy Coated Manholes
7 ea, Jack & Bores
2 ea, Decommission Lift-Stations 
Major Rock Excavation
30 VF Cuts
Owner: City of Norman, Oklahoma
Engineer: City of Norman Engineering
Contact: Mark Daniels, P.E., 405-366-5377
Contract Value: $1.7M
Completion: 2011

 

Warriors In Transition Water & Sewer

4,220 LF, 12-Inch Water
2,000 LF, of 12-Inch Sewer
Owner: Fort Bliss Water Services
Engineer: Brown & Caldwell
Contact: Daniel Monteros, 915-568-2317
Contract Value: $372K
Completion: 2011

 

Tornillo Wastewater Yard Lines & Septic Tank Demo

46,000 LF, 4-Inch Sanitary Sewer
336 ea, Decommission Septic Tanks
Owner: Town of Tornillo, Texas
Engineer: Brown & Caldwell
Contact: Horacio Juarez, P.E., 210-824-8949
Contract Value: $600K
Completion: 2011

 

Freedom Crossing Water & Sewer Line Project

8,325 LF, 6 to 12-Inch Water
4,300 LF, 12-Inch Sewer
Owner: Fort Bliss Water Services
Engineer: American States Utility Services Company
Contact: Daniel Monteros, 915-568-2317
Contract Value: $690K
Completion: 2011